Alans Boatyard Banner
AHTS (Anchor Handling - Tug - Supply)
'Far Saltire'
  Hull Construction, Propeller Nozzles etc.
  As of January 2007 the Thruster Units are now on their own page | Thrusters |
  Far Saltire
   
  The hull is totally scratch built using the 'Plank on Frame' method, once fully shaped the inside is coated with GRP resin & cloth and the outside with just GRP, see my Hull Building page for more information.
   
  Hull started in December 2002
Built mainly from Balsa Wood and Thin Ply Sheeting .
  Progress pictures, more will be added as the model advances
  Click on thumbnail to enlarge picture
     
  Marking Frames Marking out frames
  Frames Cut Out Frames Cut Out Ready for Assembly
  Starting assembly of Frames Assembling Frames
  Frames Assembled Frames, Spine and Sub Decks Assembled
  Starting to Cover Frames Starting to Cover (plank) the Hull
     Up Arrow
Stern Area Being Covered Covering Stern Area
  Stern Part Covered Stern Nearly Fully Planked
  Bow Area bieng Built  Bows showing 'Deck' Shapes
  Hull almost fully covered Hull Covering Well Underway
  Bow Filled Bow Filled
  Bow Being Shaped   Bow After Initial Shaping
  Bow with Ply Covering Bow with Ply Covering
  Hull Ready for GRP Covering Hull ready for GRP Coating
  After Covering with GRP After Coating with GRP
  Bows with GRP CoveringStern with GRP Covering  Close Up Views
     Up Arrow
As of May 2005 - new stern roller unit has been made
to replace the original wooden one I made.
| Stern Roller |
  After Initial Priming After Initial Priming
  Hull Rubbed Down  After More Filling/Rubbing Down
  Rudder Tubes Rudder Tubes Being Fitted
  Bilge Keel  Bilge Keel Ready To Fit
  Metal Items for Running Gear Various metal items for running gear
  Metal Work Assembled  Metal work assembled
  Up Arrow
Click on thumbnail to enlarge picture  
  Turning a Nozzle Propeller Nozzles being made
  Pair of Nozzles Nozzles after main shaping
  Nozzles Fully Shaped Nozzles fully shaped
  Propeller Tube Initial alignment of Propeller tube
  Lining Up Nozzle Checking nozzle position
  Rudder Unit One of the rudders being made.
  Nozzle being Fitted Starboard Nozzle being fitted.
  Rudder and Nozzle Checking the rudder set up.
  Stern View of Hull Hull after priming.
  Bow View of Hull Showing Tunnel Thruster Tube.
  Hull Side Working on the side infills.
  deck Beams Deck beams and main deck fitted.
  Port Side View General view of port side.
(October 2004)
  Up Arrow  
  Bow Bulwark Milling Bow Bulwark
  Bow Bulwark Fitted Fitting Bow Bulwark Strip
  Stern Area Stern Bulwarks
  Main Deck Bulwarks Bulwarks Main Deck
  Superstructure Starting on the Superstructure
  Stern View Hull As of October 2006
  On the Water October 2006, Testing Drives etc.
  On the water Stern View  October 2006
     Up Arrow
  A & B Decks 'A' & 'B' Decks under construction
  'A' Deck on Hull 'A' Deck placed on the hull
  'B' Deck Frame Starting to make the frame to
sit under 'B' Deck
  'B' Deck Frame Detail Detail of 'B' deck frame construction
  'B' Deck Metal Frame Frame completed
  Frame & Deck Frame with deck
  Detail on Vessel Detail of Starboard side of 'B' deck
     Up arrow
  Click Thumbnail to enlarge picture  
  A & B Decks 'A' & 'B' decks with winch units
  Bow Bulwark Template for Bow bulwark supports etc.
  Bow Bulwark with pieces Bulwark with supports etc.
  Bow Centre Panama Chock Bow Centre Panama Chock
  Bow  Baulwark Panama chock
   
  This section continues on a second Page | Hull Page 2 |
  chain graphic
   
Left ArrowUp Arrow | Far Saltire Page | My Boats Page | Useful Info Page | Home Page | Page Top|
  Material Copyright © 2008 Alan Rose