Home

Contact details

email me

Interests

Travel album

Alasdair DV Massie CEng MIStructE

CASE STUDIES

CV Summary

Personal details

Work History

Qualifications

Key Experience

Work photos

Click here for a larger scale floor plan

Click on any drawing for a full sized image

Contract Plot 1400 Theale Business Park, Reading
Value  
Client Arlington Properties
Employer Parkman
The last plot in a successful landscaped business park just off the M4 junction 12. We are providing a three storey flat slab frame with a lightweight steel framed penthouse and atrium roof above. Concrete toilet cores provide stability with a moment frame for the longer wing.

A feature staircase cantilevers from a single tubular spine beam, out into the atrium from a bridge connecting the two pairs of glass lifts.

The whole site consists of fill left over from gravel extraction so all foundations are piled.

At the time of writing the site has been cleared and major services diverted around the site. The building has been successfully but is currently on holddue to a loss of confidence by the developer as to the short term future of the market.

Click here for a larger scale long section Click here for a larger scale cross section

Click on the long section or cross sections above for a full scale image

CV Summary

Personal details

Qualifications

Key Experience

Work History

Work photos

Home

Contact details

email me

Interests

Travel album