Check
out window installations.

View
white uPVC Conservatories

email
Clayton Carpentry

Have
a look at border glass patterns available
|
|
 |
 |
|
Completing
the pointing of the stonework base.
This will support the frames on the
Porch & the internal side will
eventually be studded & insulated,
then covered in plasterboard &
skimmed.
|
The
frames installed & we now pack
the door frame to make sure that when
we tighten the securing screws, the
frame is not pulled out of position.
|
|
 |
 |
|
Essential
to make sure that all frames are packed
correctly & secured to existing
buildings.
|
Most
important, sealing of any frames to
themselves or existing brickwork to
keep out the rain & draughts.
|
|
 |
 |
|
Completing
the external guttering, before any
glass installation. We also installed
the electrical power to the internal
& external lights.
|
Glass
now almost installed & all finishing
touches underway. All glass units
were double glazed as standard &
guaranteed for 10 years.
|
|

Sneek
peek at hardwood internal doors.

Hardwood
Furniture made to customer requirements.

External
doors & frames

Rear
yards Flagged.
|