Week 18
30 July 2001
|
|
Monday and inner wall in entrance area is built up to support the RSJ. |
| The front doorway is starting to be bricked up. |
|
| Tuesday and the remaining flooring upstairs is starting to be laid. |
|
|
At last we can walk around safely. |
| Wednesday and the front opening is squared off. |
|
|
|
small window from the side is now in at the front. |
| Friday and the internal studwork is started. |
|
|
|
All the doors and window arrive |
| Saturday and the 2 bathroom windows are in. |
|
|
|
Sunday and the front window is in |
| Along with Coral's bedroom window |
|