Week 21 

20 August 2001

Monday and the hole was dug to expose the existing sewers.  Covered to prevent passers by from falling down.

Looking 2M down you can just about make out the existing sewer and notice the main power cable for the street.

Tuesday and the connection is made.  At the second attempt as the inspector insisted they use clay pipe not plastic.

The digger is armed with a hammer attachment for the next days concrete breaking up.

Wednesday and part of the drive is removed for the drains to go in.

The incoming gas pipe has also been located.  Play around with that and they will lock you up!!

Thursday and the drain pipes are in.

Also the water pipe (blue) and the gas pipe (yellow).  No questions asked where the gas pipe came from!
The temporary staircase arrives.  We will use this until we get a nice one made.

Front is insulated for the plasterer
We also insulated the hard to reach places as we won't be able to get there once the ceilings are up.

I put noggins in wherever I thought I might need a light fitting.

Friday and a lot of things going on.  1 the wall started to be built up in the lounge.
2. Drains all done.

3. Temporary staircase fitted in.
4.  The first plaster boards were up.  Note the nice handrail made of old pallet.

Too late now if I've forgotten a socket or two.

Sunday and we knew Tony the dot and dab man was coming on the Monday so we needed to get the sound insulation between the stud walls.

We had a night of itching and scratching after this little lot was in.

Back to timeline.