Week 29
15 Oct 2001
The plumber was going to work evenings this week so we had water upstairs
Monday and Tuesday came and went but no sign of him.
|
By Wednesday the garage has been built up. |
|
|
|
And the utility at the back. |
|
The electricity and gas meters were supposed to be installed. The electric was but the gas people would not work underneath the scaffold. |
|
Still no sign of the plumber.
|
Thursday and the concrete arrived for the base of the porch and the rear utility |
|
|
It sunk into the hardcore of the garage floor and had to empty it's load before it could move off. |
|
|
|
By the end of play the utility slab was down. |
Still no plumber though.
|
Saturday and we made a start on the under-floor heating upstairs. No sign of any plumber though. |
|
Sunday was a lazy day and it was decided that the plumber had to go.