Week 33
12 Nov 2001
|
Monday and the roofers came and felt and battened the roof so we could start using the garage and utility. |
|
|
|
The mock tudor timber work was started on the front of the house |
|
Tuesday and with a roof over the utility now work could start on the utility and a wall to the dogs!! shower room was built up. |
|
|
|
New drain pipes were put in. The right diameter this time. |
|
|
Thursday and a slab was placed for the hot water tank to sit on in the utility room. |
|
Friday and I put some garage lighting up. These were ones they had replaced at work. |
|
|
Saturday, the underfloor heating manifold was attatched to the wall and connected up. |
|