Week 35
26 Nov 2001
|
Tuesday and the front porch sides are being built up. |
|
|
|
After a scare on Monday when the immersion heater boiled up the cylinder water. The boiler is finally put into action. |
| Soil pipe in bathroom is redone so it actually has a fall on it and doesn't keep blocking up. |
|
|
By Friday the Porch is ready to be measured up for its door and windows. |
|
|
|
Saturday and we finally get a proper TV ariel and our satellite dish is put up. |
|
The receiver sits in what will be the study while a small 4 way splitter sends the signal the whatever room I want and a small eye lets you change channel from that room. |
|