Week 39

24 Dec 2001

Monday Christmas eve nobody does much on this day


Sunday and we laid the pipes for the underfloor heating.

Pipes connected to the downpipes that were already in place.

And out the other side.

Small inspection boxes were made for the manifolds.

Back to timeline.