Week 40
31 Dec 2001
|
New year nonsense out of the way and Saturday back to business finishing off putting polystyrene round the edges. |
|
|
|
Also cable tying pipes to the steel mesh in the extension area. |
|
|
Sunday it was time to pressure test the system by filling with water and noting any pressure drop. |
Unfortunately there was a pressure drop but the floor screeder had been notified.
And I could not find a leak anywhere on the floor so I decided
that as it was so slight to go ahead and screed next week anyway and track the leak later.