Week 46

11th Feb 2002

All the large holes through the joists had to be plated to put the strength back in after the plumber number 1 had drilled through them all.

Pies for under-floor heating had to be tucked as tight as possible to the underside of the RSJ.


Building inspector came and gave us the OK to start plastering 

So the stuff arrived on Saturday morning