Week 46
11th Feb 2002
|
|
All the large holes through the joists had to be plated to put the strength back in after the plumber number 1 had drilled through them all. |
|
Pies for under-floor heating had to be tucked as tight as possible to the underside of the RSJ. |
|
|
Building inspector came and gave us the OK to start plastering |
So the stuff arrived on Saturday morning |
|
|
|